Much of the content for these pages came from the public exhibition in June 2018, and over the Summer we've listened to your feedback and redesigned some elements, which we are sharing with local groups during September and early October 2018. 

You can also go straight to Have Your Say

Design, Materials and Next Steps

Design: We are continuing to look at appropriate materials for the development and are liaising with stakeholders to ensure the materials are suitable and sensitive to neighbouring buildings and the local area.  Out early plans use red brick and other traditional materials.

Elevations showing materials

Brick

Height and massing: The proposals continue to limit the height to ground plus 3 storeys. The new open space instead of the permitted hotel has meant that the massing of the scheme as viewed from the river, Hampton Court Bridge and from the Palace is significantly reduced.

Sketch from the Palace

Sustainability: The proposals include sustainable measures including green roofs on the new homes.  The green roofs will be used for rain water attenuation.

Green roof

Around the station

The hotel is now located on the west side of the station, adjacent to Hampton Court Way, in the area where the car dealership currently sits. The plans also include a retail store on the ground floor. This could potentially become a small food store for the local area the drop off zone for taxis and buses outside the station will also be improved and made safer.  

Next steps

Next steps

 